黄h视频在线观看视频,要爽死国产一区在线播放,www.欧美在线,奇米影视一区二区三区 亚洲人片在线观看天堂无码_伊人亚洲大杳蕉色无码_午夜福利免费日逼_五月婷婷无码在线

Hello, welcome to visit the official website of Liaoning Qianfeng Steel Plastic Pipe Manufacturing Co., Ltd.!

news

Product

contact us

Liaoning Qianfeng Steel Plastic Pipe Manufacturing Co., Ltd.

Address: Dawa Lingang Economic Zone, Panjin City

Website: www.yfny812.com


Sales of a company

General Manager: Zhao Lei 18241448558

Sales Minister: Liu Wenli 18841483313

Sales Second Company

General Manager: Zhao Shuxiu 13188225517

Sales Minister: Pei Xiaojun 13804148185

Sales three companies and foreign trade

General Manager: Dai Gang 13604976693

Sales Minister: Chen Liming 18524274505

Sales four companies

General Manager: Chen Tieyan 18341472200

Sales Director: Meng Lin 19904144892

Precautions for PE water supply pipe installation

Your current location: Home >> News >> Company News

Precautions for PE water supply pipe installation

Date of release:2018-05-31 Author: Click:

PE water supply pipe has the characteristics of corrosion resistance, non-toxicity, smooth inner wall resistance, long anti-aging service life (50 years), light weight of large-diameter plastic coated steel pipe, low construction cost, strong seismic performance, and good material flexibility. If it is used, what should we pay attention to when installing this kind of pipeline?


   When installing the PE water supply pipe, it is necessary to excavate the pipe groove, and the excavation should be in a straight line. When the pipeline is connected underground, the width of the groove bottom at the interface should be appropriately increased to facilitate installation and docking. PE water supply pipes are connected with hot melt connection and electrofusion connection. Hot-melt connection is divided into hot-melt socket connection and hot-melt butt connection, and electric fusion connection is divided into electric fusion socket connection and electric fusion saddle connection. The butt joint temperature is generally between 210-230℃, and the heating time of the heating plate is different in winter and summer. It is better that the melting length of both ends is 1-2mm.


Before installation, check whether the pipe groove meets the installation requirements, and then check the appearance of the pipe for obvious dents, cracks, scratches, or scratches, and replace it in time if there are hidden quality hazards. C20 concrete is used to set concrete supports at pipe elbows, tees, tapered joints, fire hydrants, etc., and flange valves are reinforced with brick supports.


When connecting PE water supply pipes with metal pipes, valves, and fire hydrants, steel-plastic transition joints or special flange connections must be used.


The installation and laying of the pipeline is completed, and it should be backfilled immediately after the concealed project is checked and accepted.

大口徑涂塑鋼管

The address of this article:http://www.yfny812.com/en/news/365.html

Key word:消防專(zhuān)用鋼塑復(fù)合管,消防用鋼塑復(fù)合管,大口徑涂塑鋼管廠(chǎng)家

Recently browse:

Please leave a message for us
Please input the message here, and we will contact you as soon as possible.
name
Contacts
Telephone
Telephone
mailbox
mailbox
address
address